Planned Rx Burning

Project Name
Unit Number
Type
Est. Date/Time
of Ignition
Planned Acres
Tons per Acre
Legal Descriptive Location Burn Boss County Comments Updated
Spar TS
Unit 3
Piles
 
 
87
20
T31S R10W Sec 18 Coal Creek   Coos N42º 52.153’ W123º 55.425’ Harvest Related Treatment. Fuels generated as a result of timber sale related activities, machine piled slash. Non WUI. 17-Oct-2023 16:44:52
Spar TS
Unit 2
Piles
 
 
7
1.8
T31S R10W Sec 18 Coal Creek   Coos N42º 52.224’ W123º 55.130’ Harvest Related Treatment. Fuels generated as a result of timber sale related activities, machine piled slash. Non WUI. 17-Jan-2024 13:23:42

Completed Rx Burning

Project Name
Unit Number
Type
Est. Date/Time
of Ignition
Planned Acres
Tons per Acre
Legal Descriptive Location Burn Boss County Comments Updated
Flannigan Prairie Piles
 
Piles
11/15/11
1000
2
60
32S 12W sec.15 NE NW Johnson Mt. CFPA Coos continuation of burning started on 11/14/2011 15-Nov-2011 15:26:32
Hang Third Piles
 
Piles
01/18/2012
1300
2
50
33S 11W sec.18 Rock Creek Lilienthal Coos Completed 8ac on 1/4/12 2 acres left . completed remaining 2ac on 1/18/12 18-Jan-2012 10:55:26
McCurdy DCS Piles
 
Piles
01/05/2012
0900
6
50
32S 11W sec. 16 Eden Ridge Lilienthal Coos   5-Jan-2012 12:34:57
Moore Johnson Piles
# 1
Piles
01/23/2012
0900
1
50
32S 12W sec. 10 Johnson Mt. Rd. 3363.170 Lilienthal Coos   23-Jan-2012 15:01:41
Moore Johnson Piles
# 4
Piles
01/09/2012
1000
4
50
32S 12W sec. 15 Johnson Mt. Rd. 5560.100 Lilienthal Coos   9-Jan-2012 15:33:33
Moore Johnson Piles
# 9
Piles
01/23/2012
1030
3
50
32S 12W sec. 11 Johnson Mt. Rd. 3363. 015 & 014 Lilienthal Coos   23-Jan-2012 15:12:48
Big Sixes Piles
 
Piles
01/31/2012
1000
17
55
32S 13W secs. 5,6,7 Sixes River Area MacDonald Curry completed 8 ac out of 25 on 1/25/12 completed 7ac on 1/26/12 Completed 1ac on 1/31/12 31-Jan-2012 15:16:37
Johnson Prairie
 
Piles
10/23/2012
12:00
10 acres
2 tons/acre
T32S, R12W, SEC3 Johnson Mountain CFPA Coos Completed 10/23/12 23-Oct-2012 16:40:59
DCS Piles
# 102
Piles
10/24/2012
1100
6
55
32S 11W sec. 4 FS Road 5000/Coal Creek Lilienthal/Spencer Coos completed 3 acres on 02/01/2012, Completed unit 10/24/12 24-Oct-2012 16:08:22
Big Sixes Piles
Unit 10
Piles
10/30/2012
1030
45
100
T32S, R13W, Sec5 Sixes River Spencer Curry unit completed on 10/30/12 30-Oct-2012 13:38:52
Hang Third Piles
Unit 25
Piles
11/01/2012
1000
12
50
33S 11W sec.18 Panther Ridge Lilienthal Coos completed 6ac on 11/1/12 Completed 12 acres on 11-5-12 5-Nov-2012 16:01:24
Big Sixes Piles
Unit 12
Piles
11/06/2012
1030
21
 
32S 13W sec. 8 Sixes River Area Lilienthal, Spencer Curry   4-Nov-2013 16:21:02
Big Sixes
7
Piles
11/05/2013
0100
35
 
T32S, R13W, sec. 6 Sixes River Lilienthal Coos completed unit on 11/05/13 5-Nov-2013 12:58:49
Big Sixes
8
Piles
11/06/2013
1200
5
 
T32S, R13W, sec.6 Sixes River Lilienthal Coos Completed 3 acres 10-21-2013. Completed 18 acres 11/05/13. completed 5 acres 11-6-13 6-Nov-2013 16:10:56
DCS
217
Piles
11/19/13
1000
20
5
T32S, R11W, sec. 29 Delta Saddle Lilienthal Coos Lilenthal Completed 20 acres 11/18/13. Lilienthal Completed 20 acres, Unit Complete 11/19/13. 19-Nov-2013 14:31:04
Hang Third
4
Piles
11/20/13
1000
11
10
T33S, R11W, sec.9 Panther Ridge Spencer Coos completed 11 acres on 11-20-2013 20-Nov-2013 16:22:12
Hang Third
18
Piles
11/25/13
1000
20
10
T33S, R11W, sec.9 Panther Ridge Spencer Coos Completed on 11/25/13 25-Nov-2013 15:09:58
Big Sixes Piles
Unit 13
Piles
09/25/2013
1030
14
 
32S 13W sec. 8 Sixes River Area Lilienthal, Spencer Curry   3-Dec-2013 8:12:55
Big Sixes Piles
 
Piles
01/31/2012
1000
17
55
32S 13W secs. 5,6,7 Sixes River Area MacDonald Curry completed 8 ac out of 25 on 1/25/12 completed 7ac on 1/26/12 Completed 1ac on 1/31/12 3-Dec-2013 8:13:07
Big Sixes South
 
Piles
10/1/13
10:00 AM
9
2
32S, 13W, Sec. 8 Big Sixes River Drainage Spencer Curry   3-Dec-2013 8:14:19
Big Sixes Piles
Unit 6
Piles
11/05/2013
1030
4
50
T32S, R13W, Sec.5 Sixes River Lilienthal, Spencer Curry Completed 18 acres on 10/30/12 3-Dec-2013 8:14:29
Big Sixes
1, 3, 7
Piles
11/5/2013
1030
60
50
T32s,R13, sec.6 Sixes River Lilienthal Curry No acomplishment on 10/30/12 put back in planned status 11/6/12 completed 10 Ac. 12-13-12 completed 5 acrs 3-Dec-2013 8:15:01
Hang Third
8
Piles
12/04/13
1000
47
10
T33S, R11W Panther Ridge Spencer Coos completed 10 acres 11-27-12, 47 Acres left. Completed Unit for 47 acres 12/4/13. 4-Dec-2013 15:38:11
Hang Third
28
Piles
12/04/13
1000
62
10
T33S, R11W, sec. 21&22 Panther Ridge Spencer Coos completed 15 acres 11-27-12, 47 Acres left. Completed Unit for 62 acres 12/4/13. 4-Dec-2013 15:39:07
Hang Third
# 26
Piles
12/04/2013
1000
33
50
33S 11W sec.20 Panther Ridge Lilienthal Coos 11-13-12 completed 20 acres, 11-16-12 ccompleted 5 acres 11/21/12 completed 5ac. Completed unit for 33 acres 12/4/13. 4-Dec-2013 15:43:24
Silver Doe
2
Piles
12/05/2013
1000
60
15
T31, R11, sec. 23 Eden Ridge Lilienthal Coos completed unit for 60 acres ion 12-5-13 5-Dec-2013 14:20:33
Johnson Thin
10
Piles
10/28/2014
10/27/2014
75
50
32S, 12W, sec.3 Johnson Mountain Taylor Coos 10-27-14 burned 75 acres. completed unit burned remaining 75acres 28-Oct-2014 14:28:47
Moore Johnson
7
Piles
10/28/2014
1030
57
2
T32S, 11W. Sec 5&6 Sand Rock Creek Taylor Coos completed unit for 57 acres 28-Oct-2014 16:02:27
Johson Thin
12
Piles
10/30/2014
1400
40
2
T32S, R12W, Sec 11 Johnson Mountain Taylor Coos 10-30-14 completed unit for 40 acres. 30-Oct-2014 11:16:20
DCS
101
Piles
11/03/2014
1100
27
2
t32S, R11W, Sec. 4&5 Coal Creek Taylor Coos 11-3-14 completed unit for 27 acres 3-Nov-2014 14:50:22
DCS
104
Piles
11/03/2014
1300
26
2
T32S, R11W, Sec5 Coal Creek Taylor Coos completed unit for 26 acres 3-Nov-2014 14:50:43
DCS
3
Piles
11/04/2014
1100
45
 
T32S, R11W, Sec.14 Delta Saddle Taylor Coos completed 45ac on 11/4/14 4-Nov-2014 13:46:34
DCS
4
Piles
11/04/2014
1200
17
 
T32S, R11W, Sec.14 Delta Saddle Taylor Coos 100% completed 11/4/14 4-Nov-2014 14:40:28
DCS
12
Piles
11/04/2014
1300
7
 
T32S, R11W, Sec.22 Delta Saddle Taylor Coos Completed all 7 acres 11/4/2014 4-Nov-2014 15:12:33
DCS
10
Piles
11/05/2014
 
21
 
T32S, R11W, Sec.20 Delta Saddle Taylor Coos completed 100% for 10ac 11/5/14 5-Nov-2014 13:16:16
DCS
8
Piles
11/05/2014
 
22
 
T32S, R11W, Sec.16 Delta Saddle Taylor Coos burned unit for 22 acres 5-Nov-2014 14:06:15
DCS
2
Piles
11/05/2014
 
8
 
T32S, R11W, Sec.16 Delta Saddle Taylor Coos completed for 8 acres 5-Nov-2014 14:50:51
DCS
216
Piles
11/06/2014
 
62
 
T32S, R11W, Sec.29 Delta Saddle Taylor Coos completed unit for 62acres 6-Nov-2014 15:42:10
Johnson Thin
Unit 2
Piles
10/26/2015
1000
13
2
T32S, R12W, sec.03 Johnson Mtn Taylor Coos completed on 10/26/15 26-Oct-2015 15:31:44
Johnson Thin
Unit 7
Piles
10/26/2015
1000
15
2
T32S, R12W, sec3 Johnson Mtn Taylor Coos completed on 10/26/15 26-Oct-2015 15:32:01
Johnson Thin
Unit 12
Piles
10/26/2015
1200
40
2
T32S, R12W, sec. 11 Johnson Mtn Taylor Coos completed 10/26/15 26-Oct-2015 15:32:24
Johnson Thin
Unit 10
Piles
10/26/2015
1000
125
2
T32S, R12W, sec.3 Johnson Mtn Taylor Coos completed 10/26/15 26-Oct-2015 15:45:09
Johnson Thin
Unit 13B
Piles
10/29/2015
1000
1
2
T32S, R12W, sec.3 Johnson Mtn Taylor Coos Completed 1 acres 10/29/2015. 29-Oct-2015 15:39:04
Moore Johnson
Unit 8
Piles
11/02/2015
1000
13
2
T32S, R12W, Johnson Mtn Taylor Coos Completed all 13 acres 11/2/2015. 2-Nov-2015 13:07:23
Johnson Thin
Unit 5
Piles
11/02/2015
1000
25
2
T32S, R12W, sec.10 Johnson Mtn Taylor Coos --: completed unit for 25 acres 2-Nov-2015 14:47:51
Johnson Thin
Unit 3
Piles
11/02/2015
1000
19
2
T32S, R12W, sec.10 Johnson Mtn Taylor Coos Completed all 19 acres 11/2/2015. 2-Nov-2015 16:21:37
Johnson Thin
Unit 4
Piles
11/04/2015
1000
12
2
T32S, R12W, sec.10 Johnson Mtn Taylor Coos Completed all 12 acres 11/4/2015 4-Nov-2015 13:01:58
Sndy Bits
Unit 8
Piles
11/04/2015
1100
51
2
T32S, R11W, sec.18&19 Cutbank Taylor Coos completed unit for 51 acres on 11-4-15 4-Nov-2015 16:28:56
Hang Third Rock
11
Piles
10/12/16
1100
53
.5
T 32S R 11W Sec 35 Panther Ridge Geisler Coos Unit Complete 10/12/16 12-Oct-2016 19:40:04
Hang Third Rock
27
Piles
10/12/16
1100
16
.5
T 32S R 11W Sec 20 Panther Ridge Geisler Coos Unit Complete 10/12/16 12-Oct-2016 19:42:01
Hang Third Rock
7
Piles
10/12/16
1100
48
.5
T 33S R 11W Sec 14 Panther Ridge Geisler Coos Unit Complete 10/12/16 12-Oct-2016 19:42:49
Hang Third Rock
19
Piles
10/19/16
1100
27
.5
T 32S R 11W Sec 26 Panther Ridge Lilienthal Coos 10-18-16:burned 7 acres 10-19-16:burned 27 acres 19-Oct-2016 15:35:57
Hang Third Rock
2
Piles
10/19/16
1100
19
.5
T 33S R 11W Sec 15 Panther Ridge Lilienthal Coos 10-19-16 completed 19 acres 19-Oct-2016 15:36:30
Hang Third Rock
15
Piles
10/19/2016
1000
22
3
T32S, R11W, sec. 26&35 Panther Ridge Lilienthal Coos 10-19-16 completed 22 acres 19-Oct-2016 15:37:16
Hang Third Rock
3
Piles
10/20/16
0930
15
.5
T 33S R 11W Sec 9 Panther Ridge Lilienthal Coos Completed all 15ac 10/20/2016 21-Oct-2016 7:49:48
Hang Third Rock
13
Piles
10/21/16
0930
57
3
T32S, R11W, sec. 34 Panther Ridge Jenson Coos 81 acres total; completed 24 acres on 10/20/16. 57 acres completed 10/21/16. Unit 13 complete. 21-Oct-2016 15:20:08
Hang Third Rock
14
Piles
10/21/2016
0930
48
1
T32S, R11W, sec. 33&34 Panther Ridge Jenson Coos 10/21/16 Unit 14 completed. 48 acres. 21-Oct-2016 15:20:57
Hang Third Rock
12
Piles
10/21/16
0930
35
.5
T 33S R 11W Sec 11 Panther Ridge Lilienthal Coos Total 35 acres; all completed 10/21/2016 21-Oct-2016 15:21:50
Cat Daddy
2
Piles
10/25/2016
1100
23
.5
T 33S W 14W Sec 35 Elk River Geisler Coos 10-24-16 burned 13 acres; Burned remaining 10ac 10/25/2016 25-Oct-2016 17:13:26
Cat Daddy
6
Piles
10/25/2016
1100
21
.5
T 33S R 14W Sec 25 Elk River Geisler Coos Completed all 21ac 10/25/2016 25-Oct-2016 17:13:44
Sandy Bits
7
Piles
10/25/16
1100
19
3
T 32S R 12W Sec 24 South Fork Coquille Lilienthal Coos 10-24-16 burned 5 acres; completed remaining 14ac 10/25/2016 25-Oct-2016 17:15:09
Hang Third Rock
17
Piles
10/24/16
1100
45
.5
T 32S R 11W Sec 36 Panther Ridge Lilienthal Coos 2 Piles remaining 28-Sep-2017 19:46:04
Sandy Bits
10
Piles
11/7/2017
1000
26
.5
T 32S R 12W Sec 29 South Fork Coquille TBD Coos 11-7 completed unit for 26 acres 8-Nov-2017 8:00:27
Johnson Thin
2
Piles
11/07/2017
1000
112
.25
T33S,R12W,Sec3 Johnson Mountain TBD Coos 11-7 completed unit for 112 acres 8-Nov-2017 8:07:54
Sandy Bits
11
Piles
11/8/2017
1000
14
1
T 32S R 12W Sec 20 South Fork Coquille TBD Coos 11-8: Completed unit for 14 acres 8-Nov-2017 15:40:26
DCS
202
Piles
11/9/2017
1100
32
.5
T32S, R11W, Sec19 Delta Saddle TBD Coos 11-9-17: Completed unit for 32 acres 9-Nov-2017 16:50:19
Sandy Bits
1
Piles
11-9/17
1100
48
.5
T 33S R 12W Sec 12 South Fork Coquille TBD Coos 11-9-17: Completed unit for 48 acres 9-Nov-2017 16:50:44
Sandy Bits
2
Piles
11-9/17
1100
13
.5
T 33S R 12W Sec 12 South Fork Coquille TBD Coos 11-9-17: completed unit for 13 acres. 9-Nov-2017 16:51:08
Hang Third Rock
29
Piles
11/9/17
1100
15
.5
T 33S R 11W Sec 30 Panther Ridge TBD Coos 11-9-17: completed unit for 15 acres 9-Nov-2017 17:14:23
Sandy Bits
4
Piles
11/8/17
1100
17
.5
T 32S R 12W Sec 33 South Fork Coquille TBD Coos   10-Nov-2017 15:38:18
Sandy Bits
3
Piles
11/10/17
1100
42
1
T 32S R 12W Sec 36 South Fork Coquille TBD Coos   10-Nov-2017 15:38:33
Sandy Bits
6
Piles
11/10/17
1100
9
18
T 32S R 12W Sec 26 South Fork Coquille TBD Coos   10-Nov-2017 15:38:41
Cat Daddy
10
Piles
11/11/2017
1100
59
.5
T 33S R 14W Sec 19 Elk River TBD Coos 11-11-17: BC 51 called to say they evidently completed unit last year. Added it to the Completed list 11-Nov-2017 11:31:14
Cat Daddy
11
Piles
11/11/2017
1100
51
.5
T 33S R 13W Sec 19 Elk River TBD Coos 11-11-17: completed unit for total of 51 acres 11-Nov-2017 11:44:20
Cat Daddy
7
Piles
11/11/2017
1500
5
.5
T 33S R 14W Sec 24 Elk River Geisler Coos Total 25ac; Completed 20ac 10/25/2016. 11-11-17 completed unit for remaining 5 acres 11-Nov-2017 11:44:47
Sandy Bits
14
Piles
11/11/17
1100
64
.5
T 32S R 12W Sec 27,33 South Fork Coquille TBD Coos 11-8: Burned 50 acres 11-Nov-2017 14:31:05
Hang Third
5
Piles
10/20/16
1000
18
2
T33S, R11W Panther Ridge Lilienthal Coos Completed all 18ac 10/20/16 8-Dec-2017 12:11:25
Purple Panther
2
Piles
12/3/2018
1000
16
2
T33S, R14W, Sec25 Panther Ridge Jensen Coos Completed U#2 for 16ac 12/3. 3-Dec-2018 17:37:19
DCS
7
Piles
12/3/2018
1000
8
.5
T32S, R11W, Sec21 Delta Saddle D Smith Coos Completed U#7 for 8ac 12/3. 3-Dec-2018 17:38:31
DCS Thin Unit 15
15
Piles
12/3/2018
1200
36
18
T 32 S R 11 W S 21 SF Coquille D Smith Coos Completed U#15 for 16ac 12/3. 3-Dec-2018 17:44:22
DCS Thin Unit
15
Piles
12/3/2018
1200
36
18
T 32 S R 11 W S 21 SF Coquille D Smith Coos Completed U#15 for 8ac 12/3 and 28ac remain. 3-Dec-2018 17:47:34
DCS Thin Unit 15
 
Piles
12/3/2018
1200
36
18
T 32 S R 11 W S 21 SF Coquille D Smith Coos Completed U#15 for 8ac 12/3 and 28ac remain. 3-Dec-2018 17:49:11
DCS Thin Unit 201
 
Piles
12/3/2018
1500
4
2
T 32 S R 11 W S 30 SF Coquille D Smith Coos Completed U#201 for 4ac 12/3. 3-Dec-2018 17:50:40
DCS
15
Piles
12/03/2018
14:05
36
.5
T32S, R11W, Sec21 Delta Saddle David Smith Coos completed 3-Dec-2018 18:14:28
Foggy Woody Unit 33
 
Piles
12-4-2018
1200
5
3
T 32 S R 10 W S 7 SF Coquille David Smith Coos Complete for 5 acres. 4-Dec-2018 17:57:23
DCS Thin Unit 208
 
Piles
12/4/2018
1400
8
5
T 32 S R 11 W S 29 SF Coquille D Smith Coos Completed U#208 for 8 ac 12/4. 4-Dec-2018 18:20:03
Foggy Woody Landing Pile
 
Piles
12/4/2018
0900
5
 
T32S R10W sec 7   Dave Smith Coos completed 12/4/2018 4-Dec-2018 18:20:54
Foggy Woody Unit 31
 
Piles
10/19/18
1200
66
33
T 32 S R 10 W S 7 SF Coquille TBD Coos completed for 66 acres 4-Dec-2018 18:22:38
Foggy Woody Unit 32
 
Piles
10/19/18
1200
12
36
T 32 S R 10 W S 7 SF Coquille TBD Coos   4-Dec-2018 18:25:20
Coal Camp Unit 1
 
Piles
12/4/18
1200
8
5
T 31 S R 11 W S 26 Coal Creek TBD Coos completed 12/4/2018 6-Dec-2018 7:23:52
Sandy Bits Unit 14
 
Piles
12/6/2018
0900
14
7
T 32 S R 12 W S 33 SF Coquille TBD Coos 12-6-18: completed unit for 14 acres 6-Dec-2018 15:04:32
Coal Camp Unit 2
 
Piles
12/7/2018
1500
19
5
T 31 S R 11 W S 26 Coal Creek David Smith Coos Pile complete 7-Dec-2018 18:38:01
Coal Camp Unit 3
 
Piles
12/7/2018
1500
25
25
T 31 S R 11 W S 26 Coal Creek David Smith Coos Unit complete 7-Dec-2018 18:38:27
Coal Camp Unit 5
 
Piles
12/7/2018
1500
55
27
T 31 S R 11 W S 26 Coal Creek David Smith Coos Unit complete 7-Dec-2018 18:39
Engine 103 Unit 5
 
Piles
12/7/2018
1140
23
23
T31 S- R10 W Sec 16 Rock Creek Drainage David Smith Coos unit complete 7-Dec-2018 18:39:49
Engine 103 Unit 7
 
Piles
12/7/2018
1140
71
18
T 31 S R 10 W S 17 Rock Creek Drainage David Smith Coos unit complete 7-Dec-2018 18:40:15
Two Spot Unit 2
 
Piles
12/7/2018
1000
73
18
T 31 S R 10 W S 15 Rock Creek David Smith Coos Unit complete 7-Dec-2018 18:41:30
Two Spot Unit 3
 
Piles
12/7/2018
1000
68
17
T 31 S R 10 W S 16 Rock Creek David Smith Coos Unit complete 7-Dec-2018 18:42:01
Two Spot Unit 4
 
Piles
12/7/2018
1200
71
17
T 31 S R 10 W S 16 Rock Creek David Smith Coos Unit complete 7-Dec-2018 18:42:20
Two Spot Unit 7
 
Piles
12/7/2018
1000
43
22
T 31 S R 10 W S 16 Rock Creek David Smith Coos Unit complete 7-Dec-2018 18:42:44
Spar Unit 1
 
Piles
12/6/2018
1245
113
28
T 31 S R 10 W S 17 Coal Creek David Smith Coos Unit complete 7-Dec-2018 18:43:12
Spar Unit 2
 
Piles
12/6/2018
1245
50
12
T 31 S R 10 W S 18 Coal Creek David Smith Coos Unit complete 7-Dec-2018 18:43:45
Sandy Bits Unit 12
 
Piles
12/06/18
1000
33
16
T 32 S R 12 W S 28 SF Coquille TBD Coos Hand piles and some machine pile poorly constructed. lot of dirt, large objects and space between fuels in piles. only about 75% of the unit burned. 12-Dec-2019 11:04:48
Hayrack Unit 10
 
Piles
12/17/2019
1200
48
.5
T 31 S R 10 W S 18 Eden Ridge David Smith Coos   18-Dec-2019 7:14:08
Hayrack Unit 11
 
Piles
12/17/19
1200
21
.5
T 31 S R 10 W S 18 Eden Ridge David Smith Coos   18-Dec-2019 7:14:47
Hayrack Unit 12
 
Piles
12/17/19
1200
31
.5
T 31 S R 10 W S 18 Eden Ridge David Smith Coos   18-Dec-2019 7:14:54
Hayrack Unit 13
 
Piles
12/17/19
1200
14
.5
T 31 S R 10 W S 18 Eden Ridge David Smith Coos   18-Dec-2019 7:16:09
Hayrack Unit 14
 
Piles
12/17/19
1200
7
1.5
T 31 S R 10 W S 18 Eden Ridge David Smith Coos   18-Dec-2019 7:16:15
Hayrack Unit 15
 
Piles
12/17/19
1200
57
.5
T 31 S R 10 W S 18 Eden Ridge David Smith Coos   18-Dec-2019 7:16:32
Hayrack Unit 16
 
Piles
12/17/19
1200
43
1
T 31 S R 10 W S 18 Eden Ridge David Smith Coos   18-Dec-2019 7:16:45
Two Spot
7
Piles
12/17/19
9:00 am
43
.5
T31S R10W sec16 Eden Ridge David Smith Coos 18-Dec-2019 7:16:53
Engine 103 Unit 6
 
Piles
12/17/19
1000
32
.40
T 31 S R 10 W Sec 16 Eden Ridge David Smith Coos 32 acres left to complete unit. 18-Dec-2019 7:17:13
Engine 103 Unit 8
 
Piles
10/21/19
1000
10
.20
T 31 S R 10 W Sec 17 Eden Ridge David Smith Coos 12/7/18 Completed 12 acres. 12/17/19 10 Acres left to complete. 18-Dec-2019 7:17:21
Engine 103 Unit 9
 
Piles
12/17/19
1000
67
.5
T 31 S R 10 W Sec 17 Eden Ridge David Smith Coos   18-Dec-2019 7:17:33
Engine 103 FMZ
 
Piles
11/30/20
1000
67
2
T 31 S R 10 W Sec 16,17 Eden Ridge Dave Ernst Coos Completed 10 acres on 11/19/20. Completed 5 acres on 11/20/20. Completed remaining 67 acres on 11/30/20. 30-Nov-2020 18:54:05
Two Spot FMZ
 
Piles
12/1/20
0900
22
2
T 31 S R 10 W Sec 16 Eden Ridge Dave Ernst Coos Completed 40 acres on 11/30/20. Completed the remaining 22 acres on 12/1/20. 1-Dec-2020 14:04:21
Two Spot Meadow
 
Piles
12/1/20
1100
33
2
T 31 S R 10 W Sec 16 Eden Ridge Dave Ernst Coos Unit complete on 12/1/2020 1-Dec-2020 14:04:48
Spar FMZ
 
Piles
12/1/20
1300
58
2
T 31 S R 10 W Sec 17 Eden Ridge Dave Ernst Coos Unit complete on 12/1/2020. 1-Dec-2020 15:45:05
Hayrack FMZ
 
Piles
12/2/20
0900
79
2
T 31 S R 10 W Sec 18 Eden Ridge Dave Ernst Coos Unit Complete 12/2/2020. 2-Dec-2020 15:34:58
Sweeny Meadow
 
Piles
12/2/20
1300
62
2
T 31 S R 10 W Sec 18 Eden Ridge Dave Ernst Coos Unit Complete 12/2/2020. 2-Dec-2020 15:35:57
Eden Meadow
 
Piles
12/3/20
1000
13
2
T 32 S R 10 W Sec 8 SF Coquille Dave Smith Coos Unit Completed on 12/3/2020. 3-Dec-2020 18:49:55
Foggy Woody
11
Piles
12/3/20
1100
35
2
T 32 S R 10 W Sec 7 SF Coquille Dave Smith Coos Unit Completed on 12/3/2020. 3-Dec-2020 18:50:08
Foggy Woody
33
Piles
12/3/20
1100
52
1.5
T 32 S R 10 W Sec 7 SF Coquille Dave Smith Coos Unit Completed on 12/3/2020. 3-Dec-2020 18:50:27
Clay Hill Hand Piles
 
Piles
12/13/2012
1100
35
5
T33S, R11W, Sec. 28 Panther Ridge Lilienthal Coos Completed 5 Acres 12/10/12 30 remaining 3-Dec-2020 18:51:31
Coal Camp
4
Piles
12/10/20
1000
19
5
T 31 S R 11 W Sec 27 SF Coquille Dave Smith Coos Unit completed on 12/10/2020. 10-Dec-2020 19:03:08
Foggy Woody
20
Piles
12/10/20
1500
12
3.5
T 32 S R 10 W Sec 16 SF Coquille Dave Smith Coos Unit completed on 12/10/2020. 10-Dec-2020 19:04:09
Two Spot Thin
1
Piles
12/10/20
1300
49
.5
T 31 S R 10 W Sec 16 Eden RIdge Dave Smith Coos Unit completed on 12/10/2020. 10-Dec-2020 19:04:19
Two Spot Thin
5
Piles
12/10/20
1300
112
.1
T 31 S R 10 W Sec 16 Eden Ridge Dave Smith Coos Unit completed on 12/10/2020. 10-Dec-2020 19:04:28
Two Spot Thin
6
Piles
12/10/20
1300
61
1.5
T 31 S R 10 W Sec 16 Eden Ridge Dave Smith Coos Unit completed on 12/10/2020. 10-Dec-2020 19:04:37
Spar Thin
2
Piles
10/20/21
1200
5
6
T. 31S R. 10W sec. 18 Eden Ridge Dave Smith Coos   20-Oct-2021 16:18:25
Spar Thin
3
Piles
10/20/21
1000
30
20
T. 31S R. 10W sec. 18 Eden Ridge Dave Smith Coos   20-Oct-2021 16:18:37
Spar Thin
4
Piles
10/20/21
1300
63
20
T. 31S R. 10W sec. 19 Eden Ridge Dave Smith Coos   20-Oct-2021 16:18:43
Spar Thin
6
Piles
10/20/21
1500
24
15
T. 31S R. 10W sec. 19 Eden Ridge Dave Smith Coos Completed 10/20 all acres 21-Oct-2021 8:39:55
Cedar Bark House
Unit 1
Piles
11-16-2022
1200
1
0.5
T 33S R 11W Sec 7 N42º 44.222’ W124º 03.388’ Cedar Bark House. 33Rd and 500 Intersection Near Daphne Grove. Dave Smith Coos Non WUI. Hand Piles. Fuels to be treated were generated as a result of hazard tree mitigation. 16-Nov-2022 14:59:27
DCS TS
Unit 16
Piles
11-16-2022
0900
17
2.5
T 32S R 11W Sec 28 N42º 45.485’ W123º 59.747’ Delta Saddle, off of the 3358-180 Rd Dave Smith Coos Delta Cole Saddle Timber Sale. Non WUI. Machine Piles. HARVEST RELATED TREATMENTS: Fuels to be treated were generated because of timber sale related activities including machine piled landing slash. 16-Nov-2022 15:06:01
Incline TS
Unit 11
Piles
11/08/23
1500
3
1.7
31S 10W Sec 19 Eden Ridge Smith Coos Completed on 11/8/23. N42° 51.730’, W123° 55.180’ Harvest Related Treatment. Fuels generated as a result of timber sale related activities, machine piled slash. Non WUI. 8-Nov-2023 15:15:32
Incline TS
Unit 2
Piles
11/08/23
1200
5
4
31S 10W Sec 30 Eden Ridge Smith Coos Completed 8 of 13 acres on 11/1/23. Completed remaining acres on 11/8/23. W123° 56.633’, W123° 55.137’ Harvest Related Treatment. Fuels generated as a result of timber sale related activities, machine and hand piled slash. Non WUI. 8-Nov-2023 15:16:43
Incline TS
Unit 3
Piles
11/08/23
1000
12
3.3
31S 10W Sec 30 Eden Ridge Smith Coos Completed 10 of 22 acres on 11/1/23. Completed remaining acres on 11/8/23. N42° 50.575’, W123° 55.305’ Harvest Related Treatment. Fuels generated as a result of timber sale related activities, machine and hand piled slash. Non WUI. 8-Nov-2023 15:17:16
Incline TS
Unit 4
Piles
11/08/23
1000
7
.7
31S 10W Sec 30 Eden Ridge Smith Coos Completed 14 of 21 acres on 11/1/23. Completed remaining acres on 11/8/23. N42° 50.820’, W123° 55.522’ Harvest Related Treatment. Fuels generated as a result of timber sale related activities, machine and hand piled slash. Non WUI. 8-Nov-2023 15:23:48
Incline TS
Unit 6
Piles
11/08/23
1400
5
1.5
31S 10W Sec 29 Eden Ridge Smith Coos Completed 5 of 10 acres on 11/1/23. Completed remaining acres on 11/8/23. N42° 50.985’, W123° 54.990’ Harvest Related Treatment. Fuels generated as a result of timber sale related activities, machine and hand piled slash. Non WUI. 8-Nov-2023 15:24:13
Incline TS
Unit 7
Piles
11/08/23
1400
2
1.7
31S 10W Sec 29 Eden Ridge Smith Coos Completed 7 of 9 acres on 11/1/23. Completed remaining acres on 11/8/23. N42° 51.112’, W123° 54.840’ Harvest Related Treatment. Fuels generated as a result of timber sale related activities, machine and hand piled slash. Non WUI. 8-Nov-2023 15:24:45
Incline TS
Unit 9
Piles
11/08/23
1500
5
1.3
31S 10W Sec 19 Eden Ridge Smith Coos Completed 8 of 13 acres on 11/1/23. Completed remaining acres on 11/8/23. N42° 51.303’, W123° 54.747’ Harvest Related Treatment. Fuels generated as a result of timber sale related activities, machine and hand piled slash. Non WUI. 8-Nov-2023 15:25:09
Boom TS
Unit 1
Piles
11/08/23
1100
78
1.8
T31S R11W Sec 24 Eden Ridge Imlay Coos Completed on 11/8/23. N42° 52.293’ W123° 56.633’ Harvest Related Treatment. Fuels generated as a result of timber sale related activities, machine and hand piled slash. Non WUI. 8-Nov-2023 15:33:52
Boom TS
Unit 12
Piles
11/08/23
1000
8
.99
T31S R11W Sec 24 Coal Creek West Fork Imlay Coos Completed 1 of 9 acres on 11/1/23. Completed remaining acres on 11/8/23. N42º 52.282’ W123º 56.570’ Harvest Related Treatment. Fuels generated as a result of timber sale related activities, machine piled slash. Non WUI. 8-Nov-2023 15:34:23
Boom TS
Unit 2
Piles
11/08/23
1100
44
1.9
T31S R11W Sec 24 Coal Creek West Fork Imlay Coos Completed on 11/8/23. N42º 52.143’ W123º 56.908’ Harvest Related Treatment. Fuels generated as a result of timber sale related activities, machine and hand piled slash. Non WUI. 8-Nov-2023 15:34:37